Remodeling contractor in Glenview, IL

Most of Glenview was built in the 1950s and 1960s after the Edens opened, then The Glen and the Techny area added newer housing in the 1990s and 2000s. We remodel kitchens, bathrooms and basements here, build additions and inground pools, and we take each job through the Village Development Center.

Permits
Village of Glenview Development Center (Community Development Department)
Contractor registration
Glenview requires general and demolition contractors to register with the Village before starting work, and plumbers, electricians and roofers must file copies of their licences. Source
ZIP codes served
60025, 60026

Permits in Glenview

Permits run through the Development Center, the front counter of the Community Development Department inside Village Hall at 2500 East Lake Avenue. Simple permits can be issued over the counter, small and medium jobs can go through same day review, and larger ones take the traditional plan review. Electronic submittal is encouraged.

Glenview requires general contractors to register with the Village before work starts, and plumbers, electricians and roofers file copies of their licences. If the contractor changes after a permit is issued, a change of contractors form is filed. We register before we pull. Construction hours are 7am to 7pm on weekdays, 9am to 6pm on Saturdays and 9am to 5pm on Sundays and holidays.

What the houses are like

Glenview was incorporated in 1899 and stayed a farming village, with fewer than 2,000 people as late as 1930. It had 6,142 residents in 1950 and 18,132 by 1960 after the Edens Expressway opened. The Village's comprehensive plan says most of its development happened in the 1950s and 1960s.

The Navy ran an air station in the middle of town from 1937. The base was annexed in 1971, its closure was announced in 1993, and the land became The Glen. So a 1950s house and a 2000s house at The Glen can need very different work.

Kitchens, bathrooms and design rules

In Glenview, new cabinets and flooring with no change in layout or wiring do not need a permit. Moving or adding plumbing fixtures, changing the heating or cooling system, or new electrical work does. That line decides whether a kitchen refresh is a permit job.

Exterior changes meet the Village's architectural design code. No permit is issued for improving an existing building if the result is manifestly inferior or so radically different that it hurts neighbouring values, and exterior walls must use the same or harmonious materials. One small area has its own rules. Houses at 905 to 941 Long Road, in the Glenayre Gardens subdivision near the Edens, fall in the Edens Expressway noise impact area, where remodels and additions must meet sound transmission standards.

Basements and flooding

Glenview takes in parts of the Des Plaines River, the North Branch of the Chicago River and its West Fork. The Village's hazard plan says some homes beside the rivers sit in the floodplain, and that older areas, Downtown included, were built before stormwater detention was required. Those areas are listed in the Village's 2010 Stormwater Flood Reduction Plan.

Any development in the 100 year floodplain, including additions, fences, filling and excavation, needs a Village Development Permit first. For basements, the Village offers a site drainage inspection and a cost sharing program to convert gravity sanitary sewers to overhead sewers, which it says greatly reduces the risk of sewage backup. Glenview also takes part in the Community Rating System, which earns residents flood insurance discounts.

Additions and landmarks

Glenview has a historic preservation ordinance. The Village Board designates landmarks and historic districts, and for those properties a certificate of appropriateness is required for any addition, alteration or repair that changes the exterior and needs a building permit. Check the address before planning an addition or new windows.

Outside landmarked property, additions are reviewed against zoning and the design code above. When a design is turned down under the architectural rules, the Village refers it to the Glenview Development Commission for a public hearing.

Pools

No pool can be built or altered without a Village construction permit, and the application needs scaled plans and a plot plan showing lot lines, the pool, walks, fence, water supply and drainage. The pool, its equipment and decks stay out of front yards and side yards facing a street, and at least 6 feet from side and rear lot lines. Inground pool walks and patios stay 2 feet from any lot line.

The fence and gates must be at least 4 feet high, with no opening a 4 inch sphere can pass and nothing that works as a ladder. Gates close and latch on their own, latches at the top, and stay locked when nobody is supervising. Every house door that opens onto the pool area needs an alarm, and a cover goes over the pool in the off season.

Questions

Questions from Glenview

Book a walkthrough
Does a kitchen refresh in Glenview need a permit?

Not if you only replace cabinets, flooring or trim with no change in layout or electrical work. Moving or adding plumbing fixtures or new electrical work needs a permit.

Does a Glenview pool need door alarms?

Yes. The Village pool code requires alarms on all doors of the home that open onto the pool area.

Can I get help preventing sewer backup in my Glenview basement?

The Village runs a cost sharing program to convert gravity sanitary sewers to overhead sewers, and it will do a site drainage inspection on request.

Free walkthrough

A walkthrough in Glenview.

We look at what you want to change, tell you what the house and the town will allow, and roughly what it involves. Nothing to sign.

Call (773) 900-4815
YMC Construction 3222 W Grenshaw St Chicago, IL 60624 (773) 900-4815 info@ymcconstruction.com Mon to Sun, 9am to 6pm

Request a walkthrough

What is the project?
When would you like to start?

No design fee. Nothing to sign at the walkthrough. We call twice and then we stop.

Name, phone and ZIP are all we need. We call to set a time.